Skip to content
Atenify

AI that knowsmanufacturing.

Bracket Fäste 220 in 3D in front of the headline, with Atenify's balloon on the bearing bore and a deviation marked on the M6 holes

3× M6 ⌖ ø0.2Nearing the limit

For OEMs and suppliers in Europe

Atenify reads drawings, 3D models and customer requirements, writes the control plan and catches the deviation before it becomes scrap.

Support and partners

Supported by
  • Microsoft
  • Anthropic
Part of
  • SSE Business Lab
  • Kalmar Science Park

Meet Atenify.

An AI colleague for quality and production. It reads every drawing, remembers every decision and answers with the source — in the project, in the chat and at the machine.

Atenify
Ahmed Karimi · 09:12

Does the customer's requirement list match the 3D model in PLM?

No, on one point. The M6 holes have position ø0.2 in the model and ø0.1 in the requirements. The requirements are newer.

  • PLM · Fäste-220 rev C
  • Requirements v4 · row 9
Review · Fäste 220
  • ø24 H7Matches
  • 3× M6 ⌖ ø0.2≠ requirements ø0.1
  • Pocket ↧8Matches
Ask Atenify …
Fäste 220 in Atenify's 3D view, with balloons on the bore diameter, counterbore, M6 holes and pocket
  • Fäste-220.step
  • Reads

    Drawings, 3D models, requirement lists and standards. PDF, STEP, Excel, Word.

  • Answers

    Questions from across the factory, always with the source beside it. No guessing.

  • Writes

    Reviews, control plans, PPAP and 8D. A person approves.

The problem

Manufacturing mistakes cost Europe €500 billion a year.

A single part can have a drawing, a 3D model, a requirement list hundreds of rows long, three standards and an email from the customer that changes everything. Today it is read by hand, by a few people, against the clock.

Source: Eurostat, manufacturing net turnover 2023, EU-27: €9.85 trillion. Cost of poor quality taken as 5% of turnover, the low end of the 5–35% range (Juran).

  1. 01

    The requirements are scattered.

    Drawing vault, ERP, Excel, SharePoint and email. Nobody sees every requirement on a part at once.

  2. 02

    Reviews are done by hand.

    Quality engineers spend days comparing documents line by line. The knowledge lives in a few heads.

  3. 03

    Errors show up too late.

    By the time the deviation is found, the parts are made. Then it is scrap, a complaint and an 8D.

  4. 04

    Lessons aren't reused.

    The same fault is solved again on the next part, because the lesson from the last 8D stays in a binder.

Prevent

Stop the error before it happens.

Atenify checks the requirements against the drawing at the quote, writes the control plan for this exact part and carries the lesson from the last deviation forward. An error that still slips through costs roughly ten times more at every step.

Cost of fixing the errorThe 1–10–100 rule
  1. 1×
    QuoteA question to the customer.
  2. 1×
    ReviewA line in the documents.
  3. 10×
    Ramp-upA new control plan and gauges.
  4. 100×
    SeriesScrap and rework.
  5. 1,000×
    At the customerComplaint and 8D.

Every deviation becomes a lesson in the next quote and control plan

Why we build Atenify

Europe has always been best at what is hardest to build.

Jet engines, trucks, medical devices and the machines that make the world's semiconductors. All to tolerances of thousandths, for customers who demand proof.

The next leap is not about bigger factories. It is about every requirement on the drawing making it all the way to the machine.

AI at every step.

One source

One dimension. The same in every document.

Atenify reads the drawing and the requirements once and writes every quality document from the same source. When the drawing changes you see at once what it affects, and the lesson from every deviation carries over to the next part.

62,0Ø24 ±0.05
PartBUSHING · 4471-B
RevD
AtenifyWorking
  1. 01 ReadsReads the drawing and requirementsØ24 ±0.05 · special characteristic · ISO 2768-m
  2. 02 WritesWrites every quality documentPFMEA · control plan · PPAP · work instruction
  3. 03 In syncKeeps them in sync on every changeRev D → affects 5 documents
  4. 04 LearnsLearns from what happens on the floor8D lesson → new failure mode in PFMEA
  • PFMEAØ24 ±0.05
  • Control planØ24 ±0.05
  • PPAPØ24 ±0.05
  • 8D reportØ24 ±0.05
  • Work instructionØ24 ±0.05

What changes

  1. 01 → The floorBuilds to one approved spec.
  2. 02 → The customerSees fewer claims.
  3. 03 → The next partStarts from the last lesson.

The result

Same factory.Same people.Better results.

Atenify works alongside quality, production and purchasing, and takes on what is done by hand today.

  • Mer Quality

    Every requirement from customer and drawing follows the part all the way to the floor.

  • Mindre Manual work

    Control plans, FMEAs and customer replies are drafted for you. A person approves.

  • Mindre Scrap

    Deviations are caught while the part can still be saved.

  • Mindre Complaints

    What the customer requires and what you deliver line up, traceably.

From enquiry to series.

Drawings, requirements and decisions held together through the whole project.

  1. Enquiry

    Quote

    See which requirements drive cost before you price.

  2. Enquiry

    Drawing review

    Ambiguities flagged while you can still ask the customer.

  3. Order

    Order intake

    Incoming orders are read, checked against drawing and revision, and entered in the ERP.

  4. Ramp-up

    Requirements against drawing

    Contradictions found before the first part is made.

  5. Ramp-up

    Control plan and PFMEA

    Written for this exact part, not from the last project's template.

  6. Ramp-up

    PPAP and FAI

    Compiled per part and ready to send to the customer.

  7. Series

    Questions at the machine

    Answers from the right revision. No guessing on the night shift.

  8. Series

    Deviations and 8D

    The pattern shows across batches. The 8D has evidence from day one.

  9. Change

    Drawing changes

    Rev D is in. See which control plans, gauges and orders it touches.

Keep your systems and get started straight away

Keep your systems. Get them talking.

Atenify replaces nothing. It sits on top, reads what is already there and passes it on to the people who need it.

  • ERP
  • Drawing vault
  • SharePoint
  • Quality system
  • Excel
  • Email

Up and running in an afternoon.

Drop in a folder of drawings and requirement lists and Atenify starts reading at once. No templates, no import, no consulting project.

  • .pdf
  • .step
  • .xlsx
  • .xls
  • .docx
  • .csv

Who it's for

For factories without a large quality department.

  1. Size

    Small and medium-sized manufacturers.

    You want order in the requirements and control of quality, without building your own quality department.

  2. Responsibility

    Where quality rests on a few people.

    The production manager, the technician or the CEO carries quality alongside everything else.

  3. Customers

    Suppliers to demanding OEMs.

    Customers require PPAP, FAI and 8D, and the push toward zero defects grows every year.

What Atenify writes

Done before anyone asks.

Atenify reads every drawing, requirement and measurement and writes what is needed without being asked, straight into your systems: the control plan in PLM, the order in ERP and the warning before the fault becomes scrap.

  • PDFDrawing rev C
  • STEP3D model
  • XLSXCustomer requirements
A bracket in 3D at the centre. On the left the drawing, 3D model and requirements list; on the right the control plan, warning, weekly report and 8D draft Atenify has written
  • ERP
  • PLM
  • QMS
  • CMM
  • → PLM · 08:10Control plan rev CWritten from the drawing, 42 lines.
  • Warning · 11:32M6 holes nearing the limitAdjust the fixture before the next batch.
  • → ERP · 13:20Order 4471 entered400 pcs, rev C checked against the drawing.
  • → QMS · 14:058D for the customerCause and action, with sources.

Bring a drawing. We'll show you the rest.

info@atenify.com

  • Your data stays in Sweden.

    Hosting and models in Azure Sweden Central.

  • It trains no models.

    Your documents are yours.

  • Every change is traceable.

    Who, what and when, for every decision.